Karachi Urban Mobility Project Yellow Line BRTS Request for Bids for Package 5 Construction of Road Corridor and BRT Infrastructure
Active
Description
Sindh Mass Transit Authority Karachi SMTA Employer Karachi Mobility Project Bus Rapid Transit BRT Yellow Line Contract Title Procurement of Package 5 LOT I Construction of Road Corridor and BRT Infrastructure Yellow BRT Corridor Segments 5 6 and 7 From CH 0 plus 000 at Khalid Bin Waleed Intersection to CH 3 plus 875 at Kala pull LOT II Construction of Road Corridor and BRT Infrastructure Yellow BRT Corridor Segments 4 and 5 From CH 3 plus 875 at Kala pull to CH 7 plus 571 at KPT interchange Loan No IBRD-89950 RFB No PK-SMTA-449988-CW-RFB Issued on July 13th 2026 Borrower Islamic Republic of Pakistan received financing from World Bank toward cost of Karachi Mobility Project Lot I covers 3.875 km from Khalid Bin Waleed to Kala Pull scope includes underpass one underground BRT station three at-grade stations one pedestrian bridge V3 one vertical circulation V5 Kala Pull Bridge pump station at Tariq Road Underpass BRT lanes service roads traffic signals electrical substations street lighting diversions utility relocations construction period 660 days cash flow required USD 6.30 million turnover USD 37.60 million experience 7 years similar contracts USD 23 million each or one USD 37 million steel structures 50 tons per year urban road 58000 sqm per year underpass 28000 cum per year rigid pavement 3600 sqm per year Lot II covers 3.396 km Kala Pull to KPT Interchange scope includes one underpass Sunset Boulevard six at-grade stations two pedestrian bridges two elevated U-turn bridges one flyover Sunset Boulevard one pump station BRT lanes service roads signals substations lighting period 780 days cash flow USD 11 million turnover USD 65 million similar USD 47 million each or one USD 76 million steel 60 tons per year urban road 68000 sqm per year underpass 55000 cum per year rigid 4500 sqm per year Bids must be delivered on or before 15th September 2026 at 1100 hours PST Late bids rejected Original BID and Technical Part will be publicly opened at same address on 15th September 2026 at 1100 hours Financial Part will remain unopened till second opening Evaluation Rated Criteria technical and non-price 50 percent and Bid cost 50 percent Bid Security Lot I 129000000 PKR or 460000 USD Lot II 262000000 PKR or 940000 USD Attention Project Director Karachi Mobility Project Sindh Mass Transit Authority Transport and Mass Transit Department Government of Sindh House C-44 Lane 07 Block 2 Clifton Karachi 75600 Telephone plus 92 21 99336117 Cell plus 92 331 27 28 313 Email pd.kmp.ylc at gmail.com Website https kmp.gos.pk Focal Person Engr Saleem Hussain Cell plus 92 331 27 28 313 INF KRY No 3006 2026